Projects
Create and manage projects: the modules each one uses, its plant breakdown and its packages. To start work, use Home.
Loading projects…
Data capture profile
No profile selected
Create a new profile or select an existing one above
Upload drawings
Pick a package, then upload and process supported drawing formats
Kind
Drawings
Data sheets
3D models
Drawing intake
Survey → Project Criteria → Upload & Scan
Select a package to enable uploads
Supported formats appear after package selection
Select a project to choose where to upload.
Extraction results
Structured data extracted from drawings
Select a package to view results
Pick a project and a package above. Results appear once extraction has run.
Engineering Review
Resolve engineering items that need human judgement
Settings
Your own choices: how Veridex looks, your password, and what this browser keeps.
Choose a strong password. Minimum 14 characters. You will stay signed in on this device.
Removes everything Veridex keeps in this browser: remembered filters, layouts, pane widths and unsent drafts. You stay signed in and your theme is kept. Nothing on the server is affected.
Admin panel
People, organisation standards, per-project rules and platform health.
—
Backend
—
Jobs queued
—
Jobs complete
—
Jobs failed
—
Tags on drawings
Source precedence
Decide which source wins when drawing, datasheet and IFC report different values for the same attribute.
Select a project to view or edit precedence rules.
Class link source
Decide which source supplies a tag's CFIHOS class, and in what order. The first enabled source that has a class for a tag wins. New sources appear here disabled until you place them.
Select a project to view or edit its class link source precedence.
Plant location source
The one rule that fills each tag's plant location on its register entry: set by a person, its own number, the line it is installed on, or the equipment it is part of. The first enabled source that places a tag wins; sources that disagree go to Review. Every module (Asset Explorer, register, key lists) reads the register's answer and shows where it came from. A place set by a person is never overwritten.
Select a project to view or edit where its tags' plant location is read from.
Revision scheme
How this project's drawing revisions are ordered. Used to detect a new revision of an existing drawing on upload.
Select a project to view or edit its revision scheme.
Workflow
The organisation-default workflow. A project can override it in Project rules › Project workflow.
Schema
Explore tables, columns, and foreign keys
Schema visualiser will mount here.
Organisations
Super-admin view. Creates and manages tenant organisations.
Loading...
Extraction criteria
What to read on this project’s sheets, and how the extraction is run — step 2 of the extraction flow
Tags vs the naming rules
Every label the survey read, judged against every active naming rule — reached from Project Criteria, step 2 of the extraction flow